*For Building Department Permit Applications Only* Until all required submittals have been received the submitted applications will be considered incomplete and will not be processed. When the permit is in a 'RETURNED TO APPLICANT' status it is an indicator that additional initial submittals are required. All uploaded submittals will need to be in a PDF format for the review process, the Site Plan and Elevations will need to be submitted separate of the Construction Drawings; do not separate the Construction drawings into individual files when uploading. Note that all plans must be scaled and legible.
| * | Required for Application |
| Required before application can be closed |
| Submittal Name |
Received |
Version |
Status |
|
| Application (view notes) | 7/25/2016 |
1 |
Approved |
|
| Site Plan (view notes) | 7/25/2016 |
1 |
Approved |
|
| Construction Drawings (3 copies if Food Establishment) (view notes) | 7/25/2016 |
1 |
Approved |
|